Manuscript Title:

PRODUCTIVITY ENHANCEMENT BY EMPLOYING CHANGE IN PLANT LAYOUT AND WORK-STUDY AT A GLASS PRODUCING COMPANY

Author:

IMRAN KHAN SHAIKH, JANSHER ANSARI, RANO KHAN, ALI AKBER, ABDUR RAHMAN

DOI Number:

DOI:10.17605/OSF.IO/VXC8H

Published : 2022-07-10

About the author(s)

1. IMRAN KHAN SHAIKH - Department of Industrial Engineering and Management, Dawood University of Engineering and Technology, Karachi, Pakistan.
2. JANSHER ANSARI - Department of Industrial Engineering and Management, Dawood University of Engineering and Technology, Karachi, Pakistan.
3. RANO KHAN - Department of Industrial Engineering and Management, Dawood University of Engineering and Technology, Karachi, Pakistan.
4. ALI AKBER - Department of Industrial Engineering and Management, Dawood University of Engineering and Technology, Karachi, Pakistan.
5. ABDUR RAHMAN - Department of Industrial Engineering and Management, Dawood University of Engineering and Technology, Karachi, Pakistan.

Full Text : PDF

Abstract

As per core analyses of globalization and increasing competition, businesses productivity should be improve. Sources are diminishing with each passing day, while demand is rising. More efficient utilization of resources becomes necessary as a result. As a scientific method, work and time research approaches have been utilized in all industrial and service industries to increase the efficiency of factor use. During the creation of a tea glass model, a tea glass manufacturing company is analyzed in terms of work/time spent on the project. To determine the effectiveness of tea glass models, a time survey is conducted, and standard time is determined using this technique. In the end, the goal is to measure in evitable times and take appropriate measures. Because waiting causes inefficiency in the work of moulders, efficiency has improved by 53 percent, and model production capacity has been raised to 237.


Keywords

Productivity, Work study, Time study, Plant layout.